MnM Title Photo Montage

Meet the Couple

Photos:
  • Engagement Session
  • The Wedding
  • Happy Times!

    Elements of Our Wedding:
  • Our Traditions
  • Our Rings
           Outline

    Logistics:
  • Time and Place
  • Directions
  • Accommodations

    Registry
  • Previous Page Next Page

    Second Diffusion Bond

    As before during the first diffusion bond, the compression rig was prepared and coated with White-Out, the layers were stacked, and the piece was checked for air gaps:


    The stack was then tightened, the furnace was preheated to 1425°F, the assembly was placed into the bag with charcoal, the bag was sealed and the assmebly was placed into the furnace for one hour.

    After an hour I suited up again and removed the assembly from the furance:


    The assembly was allowed to cool, and the billet was taken out of the rig. It survived the drop test! However, after annealing it was rolled once...

    Previous Page Next Page
    Please click here for Mike's normal website.